Case Studies & Project Highlights
Proven solutions for complex challenges across diverse industries.
Multi-Site Retail Chain HVAC Upgrade
Problem: An outdated and inefficient system across 50+ UK stores led to high energy bills and frequent breakdowns.
Solution: Designed and installed a centralised, smart HVAC system with remote monitoring for proactive maintenance.
Results: 35 percent reduction in energy consumption and a major reduction in emergency call-outs.
Grade II Listed University Library
Problem: Maintaining precise climate control to preserve rare manuscripts without compromising the building’s historic architecture.
Solution: A bespoke, concealed ventilation system was engineered to fit within existing structures, using low-velocity air distribution.
Results: Stable temperature and humidity achieved, protecting valuable assets while remaining invisible to visitors.
Large-Scale Manufacturing Plant
Problem: Production machinery generated intense heat, creating an unsafe and unproductive working environment.
Solution: Implemented a robust industrial ventilation and cooling system with targeted air handling units for critical zones.
Results: Ambient temperature reduced by 8°C, leading to a 15% increase in productivity and full health & safety compliance.
New-Build Private Hospital Wing
Problem: Required a state-of-the-art HVAC system with HEPA filtration and strict pressure differentials for operating theatres.
Solution: Partnered with contractors to deliver a fully compliant HTM-03-01 system, integrated with the building management system.
Results: CQC standards exceeded, ensuring optimal patient safety and a sterile clinical environment.
Data Centre Cooling Retrofit
Problem: A rapidly growing data centre faced critical overheating issues, risking server failure and data loss.
Solution: Installed high-efficiency close-control air conditioning (CCAC) units with hot-aisle containment.
Results: Power Usage Effectiveness (PUE) improved from 1.9 to 1.4, ensuring server reliability and significant energy savings.
Luxury Hotel & Spa Complex
Problem: Guest comfort was compromised by noisy, ineffective air conditioning and poor air quality in the spa.
Solution: A full refit with ultra-quiet fan coil units for guest rooms and a specialised ventilation system for the high-humidity spa area.
Results: Vastly improved guest satisfaction scores, reduced noise complaints, and energy-efficient climate control.